1. <button id="gaipj"></button>

    <progress id="gaipj"></progress>
    1.  
      中文 / EnglishEmailWeibo
      News:

      Valve Replacing Under Pressure

      Valve replacing tools (VRUP) use a plugging system designed with the principle of a downhole packer.[detail]

      Plunger Lift.

      Wellhead effluent is a common problem in the later stages of oil and gas development. With the energy consumption of the reservoir, the gas flow rate is decreasing and the carrying [detail]

      Environmental Protection

      Top-Well provides systems for handling and treating oil field produced water, fracturing fluids and other flow back fluids. High concentrations of salts and other contaminants are t[detail]

      Manufacturing

      Snubbing units are designed and manufactured in a joint venture between Top-Well and Top-Tiger.[detail]

      Turbine MRO.

      Top-Well has held a contract for AHDEB Oil in Iraq for the operation and maintenance of gas turbine power stations in Iraq since 2011.[detail]

      Pipe Pick-up&Laydown

      Top-Well’s PULD crew has been conducting more than 2 years of PULD services for Chevron CDB project in Sichuan which is high H2S content gas well development with full client sati[detail]

      Wellhead Repairing

      Valves used on tree and tubing head are the critical well control device and should always be kept in sound condition during the well life.[detail]

      Snubbing Services

      The Snubbing Operation is one of the most adaptable techniques available in the upstream oil & gas industry. [detail]

      Partners

      • Room 503, Tower C, Ruipu Mansion, Hongjunying South Road,
      • Chaoyang District, Beijing, P.R. China.
      • Phone:010-64820099/77
      • Fax:010-64820669
      • Email:top-well@www.ttyouquan.top

      Top-Well Petroleum Technology Co Ltd

      ?
      1. <button id="gaipj"></button>

        <progress id="gaipj"></progress>
        1. 亚洲一二三区日日操操夜日